
Map the site
Record row length, tilt, access points and obstacles. Build the operating plan around the actual array layout.
Assess soiling and frequency
Dust, pollen and local conditions affect the cleaning interval. Use measurements and field observations instead of assuming one fixed schedule.
Define safe operation
Check equipment compatibility with the panel type, operator training and maintenance before work starts. Evaluate production impact using site-specific data.
